Norlfok Marine
MARINE & COMMERCIAL DIVING CONTRACTORS
Tel: +353 749 736 037
 
 
CASE STUDIES

SELECT INDUSTRY SECTOR BELOW



Greystones Harbour Development
VT4 Scour Protection
Balfast Harbour Cathodic Protection
Port of Cotonou
Whitebridge Underpinning and Scour Protection
ESB Hydroelectric Station Downstream Gates
River Shannon Weir Booms
Baltic 2
Thanet Offshore Wind
Debris Control Booms
Drinking Water Treatment Plants and Storage Facilities
Limerick Main Drainage Scheme
Dun Laoghaire Harbour
Grand Canal Quay Wall Refurbishment
Kennedy Quay Pile Refurbishment

 

Port of Cotonou

Port of Cotonou


Contract Value:
N/A
Client: Soltanche Bachy
Location: Port of Cotonou, Benin West Africa
Duration: 3 Months
Completion Date: September 2011



PROJECT DETAILS:

Following completion of the installation of the Diaphragm Wall forming the quay face to the new container berth in the port of Cotonou, Benin West Africa the Contractor Soletanche Bachy was asked by the client to increase the final depth of the berth by 2m and install scour protection to enable larger vessels to use the berth.

The installation of a rock armour scour protection system required that a 2m thick layer of riprap rock be placed. Due to the toe level of the Diaphragm wall excavation to the required depth for the rock layer could not be undertaken was out weakening the walls structure.

In order to achieve the clients requirements a fabric formwork concrete scour mattress system was developed which only required a increase of 240mm of dredge depth over and above the 2m increase in berth depth asked for by the client. This was within the capabilities of the wall design and Norfolk Marine Ltd was tasked with the installation of the mattress system.

 The required equipment was despatched to site by air and sea freight and an advanced team sent to site to establish methods for the installation and filling of the mattress. Despite set backs due to the long length of the supply chain to Benin the team manage to stream line the installation works and once up and running the two dive teams on site installed and filled over 750m2of scour mattress per day. This more than doubled the expected installation rate.

The works were completed in late September of 2011 and the equipment shipped back to Norfolk Marine’s base in Ireland.         

 
 
Norlfok Marine
Norfolk Marine Ltd, Drumconner House, Drumconner, Mountcharles, Co. Donegal
Tel: 00353 74 9736037 | Fax: 00353 74 9736022 | Email: info@norfolkmarine.ie
Company Registration Number: 374553 | VAT number: 6394553W